Lịch Tham Quan10:00 AM06:30 PM
Chủ Nhật, Tháng Một 11, 2026
Praça do Império, 1400‑206 Lisboa, Portugal
Quay lại architecture
construction

Jerónimos Construction: Masters and Material

A practical chronology of Jerónimos’s making—who led the works, what they used, and how phases aligned.

1/8/2026
14 min read
Historic construction scene detail

Jerónimos rose through campaigns led by masters like Diogo Boitaca and João de Castilho—punctuated by funding cycles, seasonal labor, and material logistics.


🧱 Phasing at a Glance

  1. Foundations and church shell—stability and volume first.
  2. Cloister arcs and galleries—carving progresses in bays.
  3. Façade refinements—portal sculpture and narrative programs.
  4. Finishes—flooring, glazing, minor metalwork.

Seasonal cadence mattered: quarrying and sea transport followed weather windows.


🪨 Materials Toolkit

  • Lioz limestone: quarry blocks, rough dress, fine carve.
  • Timber: scaffolding towers, vault centering, hoists.
  • Metals: cramps, ties, and hardware for discreet reinforcement.
  • Mortars: lime-based mixes, adjusted for setting time and weather.

Historic construction motif


Site Logistics

  • River proximity eased heavy transport.
  • On-site yards sorted stone by block size and intended location.
  • Workshop marks tracked piecework and wages.
Read the Stone Look for repetitive blocks with slight size shifts—evidence of templating by one team, adjustments by another. Chisel signatures cluster by bay.

Building is choreography of trade—stone, timber, labor, and time.

[^phase]: Phases reflect funding cycles and workshop availability.

Về Tác Giả

Architecture Writer

Architecture Writer

Là người yêu Lisbon và tác giả những chuyến ‘đi chậm’, tôi viết hướng dẫn này để giúp bạn ‘đọc’ cuốn sách đá của tu viện — những chuyến hải hành và lời cầu nguyện, thi ca và ánh sáng dịu của Belém.

Tags

Construction
Diogo Boitaca
João de Castilho
Lioz limestone
Workshops

Comments (0)

Leave a Comment

Loading comments...